Sunflower

Support

Installation Guide

From your first call to your first kilowatt — here is exactly what happens when you go solar with Sunflower Energy.

01

Free Site Assessment

Our engineer visits your property to evaluate roof orientation, shading, structural capacity, existing electrical setup, and monthly energy consumption. This is completely free and carries no obligation.

02

Custom System Design

We design a solar system tailored to your energy needs and roof space, specifying panel count, inverter size, mounting configuration, and estimated monthly savings.

03

Proposal & Financing

You receive a detailed written proposal with full pricing, projected savings, and payback period. We present all available financing options including ADB-backed loans.

04

CEB Application

Once you confirm, we handle the net metering application to the Ceylon Electricity Board on your behalf. Approval typically takes 2–4 weeks.

05

Professional Installation

Our certified engineers install the panels, inverter, and cabling in a single day for most residential systems. We ensure clean cable runs and minimal disruption to your property.

06

Grid Connection & Handover

After CEB inspection and meter change, your system goes live. We walk you through the monitoring app so you can track generation and savings from day one.

07

18 Months Free Service

Your system is backed by 18 months of scheduled free service visits — we inspect, clean, and optimise to keep your output at its peak.

Ready to start?

Book your free site assessment — no commitment required.

Book Free Assessment